Scaffolding will be put up the day before your installation
Your products & installers will arrive on the morning of your chosen day
Firstly we’ll prepare your roof and install the mounts for the panels
We’ll install the panels, connect them up and make sure they’re nice & clean
Alongside this, we’ll be installing your battery & inverter into your mains power
We’ll test your newly installed system & get you set up on the monitoring app
We’ll talk you through everything & show you how to use & monitor your system
Photos will be taken & the required forms filled out using the BOXT engineer app
We’ll clean up & remove any rubbish. Scaffolding will be removed within 48 hours
Your job will be audited by our experts to check that the work meets our high standards
After your install, we’ll register your warranty and provide you with all your documents including a building control certificate which you can see in our 5-star rated App. You’ll also be covered for 2 years under our workmanship guarantee, so you can rest assured we’ll be there if you happen to have any issues.
Although every home is different, most can install and benefit from solar. It’s a great choice if you want to reduce your energy bills and carbon footprint. The main things to watch out for are not enough roof space, poor roof condition, obstacles and lots of shade. We’ll keep an eye out for all these and more as part of the process at BOXT.
There has been a significant increase in the performance of solar panels and storage solutions over the past few years. Recent studies have shown that through using a solar power system, you could cut your energy bills by as much as £1,180 a year*. The higher your energy usage at home, the greater your potential savings.
*example saving based on a detached home using a 12-panel system with battery storage on a south-facing roof
Planning permission usually isn’t required for domestic solar panel installations as they fall under ‘permitted development’. However, if your home is in a conservation area you may need to get approval from the council.
After you’ve answered some initial questions about your home, one of our experts will conduct a video survey so we can put together a tailored plan for the perfect set-up for your home.
Once we have this plan and you’ve chosen an install date that suits you, it typically only takes one or two days for the install, depending on the size of your system and access to the roof. The installation includes fixing the panels to your roof, installing all required cables and setting up your inverter.
Our engineer will give you a full run-through of the system before they leave, and we’ll also be available for ongoing support and maintenance to help you get the most out of your new system.
©2024 Boxt Limited. All rights reserved.
Boxt Limited is authorised and regulated by the Financial Conduct Authority. FCA register No. 767308. Finance is offered through Novuna Consumer Finance and HomeServe Finance; in some cases we also lend with Propensio Finance Limited. Finance available subject to status. Terms and conditions apply. Boxt Limited acts as a credit broker and is not a lender. Any credit is subject to status, affordability and a credit check. Registered in England & Wales company No. 08086606 VAT No. 257059782. Boxt Limited, 3320 Century Way, Thorpe Park, Leeds, West Yorkshire, LS15 8ZB.